LNG Canada Pre-insulation Works
KAEFER was engaged by CFHI to undertake pre-insulation works on pipework associated with the jetty and run down lines for modules as part of the LNG Canada Project.
Our Scope
- Pre-insulation of 6,500m of pipework, with line sizes of 30 and 32 inches