MLNG Tank 7

Client
JGC
Construction site
Bintulu, Sarawak, Malaysia
Period
2016-2017
Market
Energy
Country
Malaysia
KAEFER services
Insulation & Cladding

KAEFER was engaged to provide insulation & cladding services associated with the LNG storage tank. 

Our Scope
  • Over 12,000m2 of insulation works

KAEFER pre-assembled over 200 PIR elbows for faster installation with frequent inclement weather encountered at the site.

KAEFER
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies