MLNG Train 9

Client
JGC
Construction site
Bintulu, Sarawak, Malaysia
Period
2014-2016
Market
Energy
Country
Malaysia
KAEFER services
Insulation & Cladding
Access Solutions
Passive Fire Protection

KAEFER was engaged to provide a range of services associated with the MLNG Train 9 Project. 

Our Scope
  • Insulation & cladding for equipment, piping, valves and flange boxes
  • Application of passive fire protection
  • Associated scaffolding works
KAEFER
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies